Experience |
|
| |
Provided Technical Assistance for Procurement of the following major equipment / packages: |
|
 |
| |
Pedestal crane |
|
 |
| |
Test/ Production Separator Skid |
|
 |
| |
GTG package |
|
 |
| |
Fire Water Pump |
|
 |
| |
MOL Pumps |
|
 |
| |
Process Gas Compressor Module |
|
 |
| |
Dry Chemical Skid |
|
 |
| |
Crude Condensate Discharge / Injection pumps |
|
 |
| |
Diesel Storage Tank |
|
 |
| |
Instrument Air Compressor/Air Dryer Package |
|
 |
| |
Vessels |
|
 |
| |
Filters / Coalescers |
|
 |
| |
Shell and Tube Heat Exchangers |
|
 |
| |
Pumps Chemical Injection Pumps (Metering Pumps) |
|
 |
| |
Pumps Chemical Transfer Pump (Gear or Centrifugal) |
|
 |
| |
Jib Crane |
|
 |
| |
Slop Oil Pumps |
|
 |
| |
Diesel Generator Set |
|
 |
| |
Chain Pulley Block |
|
 |
| |
Produced Water Storage Tank |
|
 |
| |
Free Gas Heaters |
|
 |
| |
Well fluid heaters |
|
 |
| |
Sewage Treatment Unit |
|
 |
| |
Open / Closed Drain Pumps |
|
 |
| |
Blow Case (inside sump caisson) |
|
 |
| |
Flare Tip |
|
 |
| |
Co2Snuffing System |
|
 |
| |
Jet Fuel System |
|
 |
| |
Survival craft |
|
 |
| |
Macerators |
|
 |
| |
Downhole Pressure Equalization Pump |
|
 |
| |
Chlorinator |
|
 |
| |
Utility Water Pumps |
|
 |
| |
Surge Gas Blower |
|
 |
| |
|
|
| |
Capabilities |
|
| |
Design, Detail Engineering And Procurement Engineering |
|
 |
| |
Technical Assistance for procurement involving |
|
| |
|
Preparation of Design Basis |
|
| |
|
Preparation of Requisition For Quotation |
|
| |
|
Evaluation / raising Technical Queries on Vendor Offers |
|
| |
|
Preparation of Purchase Specifications |
|
| |
|
Review of Vendor Documents / Drawings for the following Equipment categories: |
|
| |
Static Equipment |
|
| |
|
Pressure Vessels |
|
| |
|
Heat Exchangers |
|
| |
|
Tanks |
|
| |
|
Separators |
|
| |
|
Filters |
|
| |
Rotating Equiptment |
|
| |
|
Pumps |
|
| |
|
Compressors |
|
| |
|
Turbines |
|
| |
|
Diesel Engines |
|
| |
Packages |
|
| |
|
Gas Dehydration / Glycol Regeneration |
|
| |
|
Chemical Injection System |
|
| |
|
Produced Water System |
|
| |
|
Flare System |
|
| |
|
Fuel Gas System |
|
| |
|
Potable Water System |
|
| |
|
N2 Generation System |
|
| |
|
Instrument/ Startup Air System |
|
| |
|
HVAC System |
|
| |
Material Handling Equipment |
|
| |
|
Deck Crane |
|
| |
|
Jib Crane |
|
| |
|
Monorail Hoist |
|
| |
|
Chain Pulley Block |
|
| |
|
Valves & Piping Specialty Items |
|
| |
|
Valves |
|
| |
|
Pig Launchers & Receivers |
|
| |
|
Sample Bomb |
|
| |
|
Biological / Corrosion Probe |
|
| |
|
Barred / Scrapper Tee |
|
| |
|
Flame Arrestor |
|
| |
Fire & Safety Equipment |
|
| |
|
CO2 Snuffing System |
|
| |
|
Fire Extinguisher |
|
| |
|
DCP Skid |
|
| |
|
Survival Craft |
|
| |
|
Life Raft & Scramble Net |
|
| |
|
Life Ring Buoy |
|
| |
|
Helicopter Rescue Kit |
|
| |
|
Life Jacket & Marine Work Vest |
|
| |
|
Breathing Air System |
|
| |
|
First Aid Kit |
|
| |
|
Eye Wash & Safety Showers |
|
 |
| |
|
|
| |
Documents / Deliverables |
|
| |
Design Basis |
|
 |
| |
Requisition For Quotation |
|
 |
| |
Technical Queries |
|
 |
| |
Technical Bid Analysis |
|
 |
| |
Purchase Specifications |
|
 |
| |
Material Handling Reports |
|
 |
| |
Static Equipment Design |
|
 |
| |
General Arrangement Drawings for Static Equipment. |
|
 |
|
|